Active construction site of Snowy 2.0 hydroelectric project with cranes and temporary buildings on a rugged landscape.

This image captures an extensive construction setup of the Snowy 2.0 hydroelectric project. Towering cranes, numerous temporary buildings, and storage tanks are scattered across the site, all set against the contrasting backdrop of dense, green hillside forestry. The infrastructure is indicative of the project’s scale and complexity, with the rugged terrain of the area highlighting the engineering challenges. Foregrounded by a partially dried lakebed, the scene underscores the significant environmental and logistical considerations inherent in such a grand renewable energy initiative.